Temp Road Closure
19/07/2025
A temporary road closure has been put in place to allow Fibrus to carry out utility works which are expected to commence 31st July 2025 and anticipated to take 5 days to complete.
Please see below details of the extents of the restriction(s) and any alternative route(s) which may be in place, the relevant legal notice can be viewed at https://api-gb.one.network/downloads/tm/4587/reactivation-notice-w-f_144501648_3947369_710f557f60.pdf and a location plan clearly showing these extents can be found on one.network via link https://one.network/?tm=144501648
Location: C5010 Grizebeck from its junction with the A593, extending in a south easterly direction for approx 1.3km.
Alternative Route: A suitable alternative route will be signed and made available via the C5012 and A593. A way for pedestrian